Quality Control Checklist for Excavation Work
August 18, 2017
Adherence to the upcoming quality control checklist will ensure site excavation work is carried out methodically, from the arrival of the first excavator to the laying down of the final back filled load of topsoil. Absolute procedural control is the goal here, and that goal becomes that much easier to realize when a poorly coordinated process adopts a controlled, properly managed approach to this potentially hazardous operation. Let's begin with excavation planning.
Excavation Planning
An engineering checklist is a tool, not one that lifts earth or constructs buildings, but it's most definitely an invaluable tool, nonetheless. At the top of that list, the site configuration gets unreserved attention. Photos are taken of the area before a shovelful of earth is removed. Visually record progress by continually taking pictures from different angles.
Interpret Soil Boring Reports
Difficult trenching conditions hamper the excavation work. Carry out test borings before the digging commences. By following this guideline, an accurate map of the subterranean geography is compiled. Consult the logs to gauge the elevation of site hazards, including the local water table and other geotechnical obstacles.
Call in Supplementary Systems
Floodlights illuminate the site when the sun sets early. Water pumps keep the trench dry and accessible if the aforementioned water table sits high. Likewise, skips and flatbed trucks need to be deployed when surface spoil hampers progress.
Concluding Site Preparation
Spray painted lines mark the routes of utility channels. The cable tracing service has tagged all of these runs, plus a utility map has been used to locate other services. Now that these concealed ground features are properly traced, the excavator is informed of the optimal dig route.
Check Border Zones
The existing services are found, prepared for possible rerouting, and all stake out lines have been set out. Next, establish site roads, haulage areas, and disposal sites.
Checklist Methodology: Leverage Sequential Benefits
Employ the services map as a means of avoiding loading damage when the excavator travels on-site. Follow this step with drainage and material removal solutions so that the site spoil and ground water are continually removed from the trench.
The excavation checklist is followed by structural work, by trench buttressing and soil compaction procedures. Cables are laid, foundations poured, utility services are inspected, and other important duties are accomplished. Meanwhile, safety signage is erected, worker safety procedures are enforced, and the backfill stage arrives. From here, the excavation is concluded, the soil is compacted, and the site is restored to its former pristine condition.
Optimized by NetwizardSEO.com.au
Recent posts
- What are the 4 Different Types of Trenches?
- Understanding the Importance of Cable Duct and Conduit Sealing
- Directional Boring Techniques and Precautions
Posts 2020
- Construction and Engineering Covid19 Safe Workplace Principles
- Basic Procedures of Backfilling in Foundation
- View all articles…
Posts 2019
- The Importance of Design Integrity for Substation Transformer Foundation
- Pipeline Construction Process After Council Permits are Granted
- View all articles…
Posts 2018
- Hot Water Tapping and Backflow Prevention Services in Melbourne
- Electrical Grid Connection Services in Melbourne: What does this Job Entail?
- View all articles…
Posts 2017
- Roles and Responsibilities of a Surveyor in Construction
- Benefits of Underground Electricity Connections versus Overhead Powerline Connections
- View all articles…