Safe Traffic Diversion During Road Construction

September 13, 2021

For a country to grow and nourish effectively, it must maximise a great network of roads. Roads are pivotal to the development of a nation since they can provide convenient access to economic, health, education, and social services. And as more areas are opened and connected to the road networks, they can effectively have a better and faster flow of services related to transportation.

Given the importance of roads, authorities allocate a huge amount of funds just to ensure that they are built and constructed effectively.

Road construction projects typically involve the paving, rehabilitation, and reclamation of ruined pavements. These projects must be done properly so that road traffic safety is preserved. They must likewise be conducted effectively to attain all the benefits of roads.

The Need for Safe Traffic Diversions

Now, even though roads can provide greater access to the aforementioned services, their construction might somehow affect the movement of the traffic negatively in the area. Therefore, a safe traffic diversion must be present for the welfare of the pedestrian, vehicles, and workers.

Safe traffic diversions are necessary so that the movement of the pedestrian traffic, vehicles, and transit operations will seamlessly continue during the construction. Additionally, they can ensure that the workers working for the road construction projects are safe from any potential risks and hazards of continuous traffic. Access to utilities and properties are likewise maintained with the existence of traffic diversions.

Main Types of Safe Traffic Diversion

Traffic diversions that are deemed safe can be categorised into two.

The first type of traffic diversion is done by moving the traffic on the existing carriageway under improvement. An existing roadway may be used for the passage of traffic, as long as treated shoulders are placed on the side where construction is not in progress yet. The shoulders must be treated with a thick granular base course and coated with a bituminous surface dressing. However, if the existing two lanes will be widened into four lanes, then the additional two lanes must be done first so that the traffic is diverted into them before treating the existing carriageway. Once the road construction is done, the treated shoulders and debris must be dismantled and eliminated, respectively.

The second type of traffic diversion is conducted by moving the traffic along with a temporary diversion. Road stretches that cannot be used for the passage of traffic must be constructed with a temporary diversion. The makeshift traffic diversion should have a carriageway and earthen shoulders on each side alongside a specific provision for road crust.

Regulating the Safety of Traffic Flow

To ensure that the flow of traffic is regulated, a couple of things must be done.

For one, contractors have to install flags, signs, lights, markings, and flagmen on the surroundings of the involved road construction area so that all vehicles and pedestrians will be protected and informed of the situation. Additionally, areas on which the traffic will deviate from its usual path may utilise pavement markings or painted drums.

To know more about these things, you can call us at Metro Pits.